LANCE INSERT HOLE ASSEMBLY OF OXYGEN LANCE FOR CONVERTOR.
Description
JACTET OF OXYGEN LANCE
UNIT/SECTION: STEEL MELTING SHOP/ CONVERTOR
EQUIPMENT: OXYGEN LANCE
Overview
MOC: Plate Q245R, others Q235B, pipe 20 GB3082-2008.
Certificate: Material Inspection, Test Report.
Guarantee: 18months from the date of shipment or 12 months from the date of received, which ever is early.
After-sales service provided: Online-support installation, commissioning and training.
Technical Details:
Pressure test 1.0Mpa 1hour.
Welding shall be built&inspected as per IBR Ed07.
Hydro test is as per IBR, test pressure shall be minimum 1.5 times of maximum allowable working pressure.
Feed water quality is as per GB1576-2001.
The equipment flange pressure rating should be 300LB/SQ.INCH .
We can design and meet customers’ requirements.