LANCE INSERT HOLE

LANCE INSERT HOLE ASSEMBLY OF OXYGEN LANCE FOR CONVERTOR.

Description

JACTET OF OXYGEN LANCE

UNIT/SECTION: STEEL MELTING SHOP/ CONVERTOR

EQUIPMENT: OXYGEN LANCE

 

Overview

MOC: Plate Q245R, others Q235B, pipe 20 GB3082-2008.

Certificate: Material Inspection, Test Report.

Guarantee: 18months from the date of shipment or 12 months from the date of received, which ever is early.

After-sales service provided: Online-support installation, commissioning and training.

 

Technical Details:

Pressure test 1.0Mpa 1hour.

Welding shall be built&inspected as per IBR Ed07.

Hydro test is as per IBR, test pressure shall be minimum 1.5 times of maximum allowable working pressure.

Feed water quality is as per GB1576-2001.

The equipment flange pressure rating should be 300LB/SQ.INCH .

We can design and meet customers’ requirements.

Reviews

There are no reviews yet.

Be the first to review “LANCE INSERT HOLE”

Your email address will not be published. Required fields are marked *

Time limit exceeded. Please complete the captcha once again.