MOVABLE HOOD
FUNCTIONAL LOCATION:SMS WHRB
UNIT: 2.2MTPA STEEL PROJECT OF WASTE HEAT BOILER
Description
Overview
REQUIREMENT: WITH IBR CERTIFICATE
Certificate: All materials IBR certificates.
Dimensional certificates. Welder certificates. Pressure testing certificates.
Complete hood certified with IBR.
Guarantee: 18months from the date of shipment or 12 months from the date of received, which ever is early.
After-sales service provided: Online-support installation, commissioning and training.
Manufacture Notes
All hood segments shall be built and inspected as per IBR Ed07 and ASME Section I Ed07 ‘Rules for Construction of Power Boilers’.
Welding shall conform to IBR Ed07. The butt welds of tube shall be argon arc welding, cover pass shall be manual welding. The other rest welding shall be shield metal arc welding.
Butt welding for header shall be checked with 100% RT. Butt welds of tube shall be 10% RT, and fillet welds of nozzle on headers shall be 10%PT. The butt welds of return caps shall be 100% RT. RT shall be acc to IBR Ed07.
The working pressure of equipment is 3.27Mpa. Cold water pressure test shall be carried out on completion of fabrication at the pressure of 4.9Mpa acc to IBR-61.
The inside of equipment shall be carried out stand blasting SA 2.5. Dry-film-thickness shall be 40µm. Before delivery, all the openings shall be closed with cap to prevent foreign matters falling into it during handling or transportation.
Technical details
名称Name | 参数Value |
额定压力Rated pressure | 2.45Mpa |
压力波动Pressure surge | 0.2-0.45Mpa |
液柱静压力Head of liquid | 0.25Mpa |
循环泵压头Head of circulating pump | Natural circulation |
工作压力Working pressure | 3.15Mpa |
计算压力Calculation pressure | 3.27Mpa |
工作温度Operating temperature | 225℃ |
计算温度Calculation temperature | 255℃ |
容积Containment | 0.88m³ |
焊缝系数Value of welded joint | 1 |
腐蚀裕量 Corrosion allowance | 1.6 |
受热面积 Heating surface area | 6.77㎡ |
介质 Medium | BFW/STEAM |
Reviews
There are no reviews yet.