TUNDISH PREHEATING DEVICE
DRYING STATION
FUNCTIONAL ASSEMBLY: CCM
EQUIPMENT: TUNDISH
Description
Overview
Guarantee: 18months from the date of shipment or 12 months from the date of received, which ever is early.
After-sales service provided: Online-support installation, commissioning and training.
Supply scope(BOM)
S/NO. | ITEM | QTY | Description |
1 | Mainframe rack | 1 | ▼Travel switch and base, hitter: 1 set ▼Asbestos gasket (packed on the gas pipe of the main frame) |
2 | Bearing housing | 2 | ▼2pcs oil cup ▼2 set of copper inner sleeves |
3 | Compound shaft | 1 | ▼Gas seal assembly (installed): 1 set |
4 | Electrohydraulic push rod | 1 | ▼10TON
▼415V ▼stroke1500 |
5 | Burner | 5 | ▼With fire cover |
6 | Cross arm | 1 | ▼Long open fire gas pipe: 1EA |
7 | Fan | 1 | ▼with outlet flange and connecting piece
▼5.5kw,Clockwise ▼415V |
8 | Fan riser | 1 | ▼Air riser (explosion-proof bag tube, pipe clamp) |
9 | Gas riser | 1 | ▼Nitrogen purge valve and long open fire valve: 1 set |
10 | Pneumatic shut-off valve | 1 | ▼DN200 pneumatic quick shut-off valve with oil-water separator, positioner, and etc. |
11 | Pressure Switch | 1 | ▼0~5000pa low pressure alarm |
12 | Manual adjustment valve | 2 | ▼DN200 |
13 | Electric control box | 1 | ▼The key is inside the box |
Reviews
There are no reviews yet.